Hisense large span steel warehouse prefab steel warehouse

Short Description:

Product description Our Company Production process Project Exhibition Customer Visiting FAQ Package & Transport 1. Introduction: Hisense logistic steel structure warehouse was completed by Qingdao Xinguangzheng Steel Structure Group. It was located in Qingdao city, Shandong province, China. There are 2 phases of steel structure buildings. Total building area is more than 130,000 m2. Year 2014: The first phase, total area is 40,000 square meters, we supplied from the design to fabricatio...


Product Detail

Product Tags

Product description

Our Company

Production process

Project Exhibition

Customer Visiting

FAQ

Package & Transport

1. Introduction: Hisense logistic steel structure warehouse was completed by Qingdao Xinguangzheng Steel Structure Group. It was located in Qingdao city, Shandong province, China. There are 2 phases of steel structure buildings. Total building area is more than 130,000 m2. Year 2014: The first phase, total area is 40,000 square meters, we supplied from the design to fabrication to erection. It only took 23 days! It is very famous in China! Year 2015: According to the first phase, the clients satisfy with our group factory very well, so they gave us the second phase 90,000 sqare meters. In addition, the roof and wall structure is composited of top single sheet steel + fiberglass insulation + bottom sheet. It has a good performance of fireproof and insulation. Besides, for the steel structure warehouse, there are parapet walls to have a perfect appearance!

warehouse (1)warehouse (2) warehouse (3)photobank (7) 微信图片_20201230140226 微信图片_20201231140328


  • Previous:
  • Next:

  • Related Products